Ground reinforcement work | Achieving shortened construction periods with immediate start and zero leftover soil using the RES-P method.
Immediate construction with zero spoil and zero curing! The RES-P method for ground reinforcement reduces excavation costs and shortens the process through the use of small-diameter steel pipe penetration without the need for cement.
To prevent the risk of ground subsidence in new residential construction, it is important to carry out ground reinforcement work based on accurate surveys. Ignoring insufficient ground bearing capacity can lead to uneven subsidence, causing distortion and structural defects in buildings, which can significantly diminish the asset value of the home in the future. The RES-P method is a rational piled raft foundation technique that involves driving small-diameter steel pipes into the ground, enhancing ground bearing capacity through the composite effect of the steel pipes and soil. This method does not use any cement-based solidifying agents, which means that no construction waste is generated on-site, completely eliminating disposal costs and transportation expenses. Additionally, since there is no need for a solidification curing period, work can transition to foundation construction immediately after pouring, greatly contributing to the reduction of tight project schedules. The use of small machinery based on a 2-ton truck allows for smooth construction with low noise and vibration, even in narrow or adjacent sites. GeoTech Co., Ltd. provides overwhelming construction efficiency and reliable reinforcement quality through objective evidence of penetration data and strict quality control using construction management devices.
- Company:ジオテック
- Price:Other